Herunterladen Diese Seite drucken

Helios RVE 80 Montage- Und Betriebsvorschrift Seite 4

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Air tight in-duct back draught shutter RVE..
DISASSEMBLY/ASSEMBLY
Fig. 1
Fig. 2
Fig. 3
Fig. 5
Service und Information
D
HELIOS Ventilatoren GmbH + Co KG · Lupfenstraße 8 · 78056 VS-Schwenningen
CH HELIOS Ventilatoren AG · Tannstrasse 4 · 8112 Otelfingen
A
HELIOS Ventilatoren · Postfach 854 · Siemensstraße 15 · 6023 Innsbruck
Vertical (bar) posi-
tioning.
Fig. 4
Fig. 6
INSTALLATION POSITION
Fig. 1:
RVE positioning during installation in ventilation duct
DISASSEMBLY
Fig. 2:
Apply the RVE shutter on two at least 15 mm high
support plates. The distance between the support
plates should be approximately 20 mm.
Position the RVE shutter with the holding bar and the
fastening pins centrically.
Fig. 3 and 4:
Push out the three pins of the holding bar carefully
one after another with a hard piece of wood or a
similar tool.
Fig. 5:
Turn the RVE shutter, lift carefully the holding bar and
remove the rubber membrane.
m
Membrane can be damaged!
ASSEMBLY
Fig. 6:
Put a new rubber membrane on the RVE shutter and
attach the hold holding bar on carefully.
F
HELIOS Ventilateurs · Le Carré des Aviateurs · 157 av. Charles Floquet · 93155 Le Blanc Mesnil Cedex
GB HELIOS Ventilation Systems Ltd. · 5 Crown Gate · Wyncolls Road · Severalls Industrial Park ·
Colchester · Essex · CO4 9HZ
ATTENTION: Do not use sharp-edged tools.

Werbung

loading

Diese Anleitung auch für:

Rve 100Rve 125Rve 160Rve 20025842587 ... Alle anzeigen