Herunterladen Inhalt Inhalt Diese Seite drucken

Installation, Handling And Initial Operation; Scope Of Delivery; Technical Data; Spare Parts And Accessories - egger EL 4 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3

Installation, Handling and Initial Operation

3.1

Scope of delivery

Please check whether the delivery is complete and whether all parts are free from transport
damage. Immediately inform us or the distributor about missing parts or transport damage.
The UV-curing unit egger EL 4 consists of:
1 varnishing drawer
1 mains cable
1 user and processing instruction
and can be put into operation right away.
3.2
Technical data of the light-curing unit egger EL 4
Power supply:
Mains frequency:
Connection:
Power input:
3.3
Spare parts and accessories for the light-curing unit egger EL 4
UVA – light bulb
Reflecting foil set
Varnishing drawer
3.4

Assembling and connecting the unit

The electrical light-curing unit egger EL 4 corresponds to the state-of-the-art standards and to
the acknowledged safety regulations, nevertheless dangers can arise. Please observe the fol-
lowing, before putting the unit into operation:
Qualified and trained persons must use the device only.
Please adhere to the safety regulations accepted.
Use the unit in perfect and clean conditions only and by observing the user instruc-
tions.
Put the device horizontally and place it in its suitable working position.
Before putting the device into operation, the user has to read the operating instruc-
tions and ask the manufacturer in case of any questions.
Protect the unit against abrasion.
Check, whether the unit is dry.
Check whether the device is in technically perfect condition, especially the mains
cable!
Plug in the mains cable.
EL 4_51205_D_E.doc
230 V +/- 10 %
AC 50 Hz
mains plug Schuko (German) (or US)
AC 120 Hz
REF 50103
REF 51209
REF 51208
Seite / Page 15 von / of 20

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis