Herunterladen Diese Seite drucken

Wahoo KICKR BIKE SHIFT Montageanleitung Seite 8

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 74
KICKR BIKE SHIFT SETUP
CAUTION
Heavy object.
Two person lift
required.
1. Begin by laying the package on its side.
Once you've opened the box, remove
contents from the the top layer and
set them on the floor near the
assembly location.
2. Install the rear leg and secure it with two 5mm Allen bolts.
Team lift the unit out of the box, with one person holding
the recently installed leg, and the other person
holding the head tube.
3. Install the other rear leg and secure it with
two 5mm Allen bolts. Proceed onto installing
the front leg and securing it with four 5mm
Allen bolts.
8
KICKR BIKE SHIFT assembly
requires two people.
Tightening torque
5
mm
1
24 - 28 N- m
2

Werbung

loading