Herunterladen Diese Seite drucken

Entes EVM-15 Bedienungsanleitung Seite 4

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

VOLTMETER
EVM-15
User Password Settings
User password is set and activated in this menu. In order to prevent the
device's settings from unouthorized access, it is necessary to set up a 4
digits user password and then activate it.
This menu has 2 submenus.
Changing the User Password
In this menu, user password can be changed.
Note: Factory set value for user password is "1234"
In order to change the user password; in measurement mode,
Press SET button for 3 secs. (trF menu is displayed)
By using UP/DOWN buttons, find CodE menu
Press SET button (EnbL menu is displayed.)
By using UP/DOWN buttons, find CHnG menu.
Press SET button (Most left digit of display blinks)
By using UP-DOWN-SET buttons, enter
old password. If you enter wrong pass-
word device display shows "Err" message.
In this case press SET button then repeat
processes again.
By using UP-DOWN-SET buttons, enter
new password.
By using UP-DOWN-SET buttons, enter
re-enter new password. If you enter
wrong password device display shows
"Err" message. In this case press SET
button then repeat processes again.
Press SET button CHnG is displayed. (New value is entered but is not exe-
cuted yet. In order to set the new value, please follow below steps.)
Press ESC button one by one until CAnC is displayed.
By using UP/DOWN buttons, find SAUE
Press SET button while SAUE is displayed. (If you press ESC button or select
"CAnC" option instead of "SAUE", new data is cancelled and the previous
data is set.)
Activating the user password
This menu is used to activate the user password.
After activating the user password, if SET button is pressed for 3 seconds
in order to enter to the menu, a user password is required.
In order to set CT ratio. In the measurement mode;
Press SET button for 3 seconds (trF menu is displayed.)
By using UP/DOWN buttons, find CodE menu
Press SET button (EnbL menu is displayed.)
Press SET button (Most left digit of display blinks)
By using UP-DOWN-SET buttons, enter the
password. If you enter wrong password
device display shows "Err" message. In this
case press SET button then repeat processes
again.
Press SET button, no is displayed.
By using UP/DOWN buttons, find yES
menu
Press SET button, EnbL is displayed. (New value is entered but it is not
executed yet. In order to set the new value, please follow below steps.)
Press ESC button one by one until "CAnC" is displayed.
By using UP/DOWN buttons, find SAUE
Press SET button while SAUE is displayed. (If you press ESC button or
select "CAnC" option instead of "SAUE", new data is cancelled and the
previous data is set.)
Panel Cut-outs
Type PR 19
(96x96)
Connection Diagram
Sistem
PR-19
Technical Features
Operating Voltage (Un)
Frequency (Hz)
Auxiliary Supply Power Consumption
Measurement Input Power Consumption
Vin
Measurement Range
Class
Voltage Transformer Ratio
Primary
Secondary
Ambient Temperature
Display
Dimension
Equipment Protection Class
Box Protection Class
Terminal Protection Class
Box Material
Installation
Wire Crossection (for terminal block)
Weight
Installation Category
Panel Size
Complies with EN-61010-1 standard.
Factory Set Values
Prı - 00100
SEC - 100
CodE EnbL - no
CodE - 1234
"Bu ürün, 30.05.2008 tarih ve 26891 sayılı resmi gazetede yayınlanan EEE
Yönetmeliğinin Madde 2 ve Ek-1A madde 9 kapsamındadır. "
Dimensions
Type PR 19
(96x96)
: 24 ... 250 V AC/DC
: 45-65 Hz
: < 4 VA
: < 1VA
: 1 - 300 VAC
: 0...40 kV
: 0.5±1digit [(%10-%100) x full scale]
: 1-40000
: 1-300
: -5°C; +70°C
: Red LED display
: PR-19
: Double Insulation-Class II (
)
: IP 54
: IP 00
: Non-flammable
: Panel Mounted
: 2.5 mm2
: 0.30 kg
: Class III
: 91x91mm

Werbung

loading