Herunterladen Diese Seite drucken

Entes EVM-15 Bedienungsanleitung Seite 3

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

VOLTMETRE
EVM-15
1 ..........
This display shows to measured voltage
2 ..........
ESC Button. Used to quit from the menu.
3 ..........
DOWN Button
4 ..........
UP Button
5 ..........
SET button. It is used to enter into the menu and to save the values.
If SET button is pressed for 3 seconds in the measurement mode, you
can enter into menus.
Precautions For Installation And Safe Use:
- Failure to follow those instructions will result in death or serious injury.
- Disconnect all power before working on equipment.
- When the device connected to the network, do not remove the back panel
- Do not try to clean the device with solvent or the like.Only clean the device
with dried cloth.
- Verify correct terminal connections when wiring.
- Electrical equipment should be serviced only by your component seller.
- Only for rack panel mounting.
- The fuse should be used F type and current boundary value must be 6A
No responsibility is assured by the manufacturer or any of its subsidiaries
for any consequences arising out of the use of this material.
General Information
EVM-15 is designed to measure the phase voltage of the single phase system.
Application of EVM-15
1) It can measure phase voltage in single phase systems.
2) Voltage transformer primer ratio (1-40000) and seconder ratio (1-300) can be programmed.
3) A password can be arranged from CodE menu in order to prevent
change of the setting by unauthorized person.z.
EVM-15 Menu Settings
After making the connections of the device as given in user manual, voltage is
supplied. Required settings must be done by using menus in order to have the
correct measurements and applications.
Voltage transformer ratio:
Primary and secondary values of Voltage Transformer ratio can
be programmed in this menu.
Note: Enter the primary value as 00100 and secondary value as
100 if there is no voltage transformer is used between EVM-15
and system.
For example; If there is 34500V/100V voltage transformer is used
between EVM-15 and system;
Primary value of voltage transformer = 34500,
Secondary value = 100 is set.
Programming the primary value for voltage transformer:
Primary value for voltage transformer is programmed in this
menu. This value can be entered between 1-40000.
In order to enter the voltage transformer primary value; press
SET button for 3 sec. in measurement mode (trF is displayed)
Press SET button (Prý menu is displayed)
Press SET button (Most left digit of display blinks)
Find 1st digit of the value which you want to enter by scrolling
UP/DOWN buttons.
Press SET button (2nd digit of display blinks. If you set 1st digit
value incorrect, you can set again by pressing ESC button)
Find 2nd digit of the value which you want
to enter by scrolling UP/DOWN buttons.
Enter the other digits similarly by scrolling
SET, UP and DOWN buttons.
Press SET button (most right digit of display
blinks. If you set 4th digit value incorrect,
you can set again by pressing ESC button)
Find 5th digit of the value which you want to enter by scrolling UP/DOWN
buttons.
Press SET button, Prý menu is displayed. (New value is entered but it is
not executed yet. In order to set the new value, please follow below steps.)
Press ESC button one by one until CAnC is displayed.
By using UP/DOWN buttons, find SAUE
Press SET button while SAUE is displayed. (If you press ESC button
or select "CAnC" option instead of "SAUE", new data is cancelled
and the previous data is set.)
Programming the Secondary value of voltage transformer:
Secondary value of voltage transformer is entered in this
menu. This value can be entered between 1-300.
In order to enter the secondary value; press SET button for 3 sec.
in measurement mode (trF is displayed)
Press SET button (Prý menu is displayed)
Find SEC menu by scrolling UP/DOWN
buttons.
Press SET button (3rd digit blinks in
display).
Enter the 3rd digit value by scrolling
UP/DOWN buttons.
Press SET button (4th digit of display blinks.
(If you set 3rd digit value incorrect, you can set again by
pressing ESC button).
Enter the 4th digit value by scrolling UP/DOWN buttons
Press SET button (most right digit of display blinks. If you set 4th
digit value incorrect, you can set again by pressing ESC button)
Find 5th digit of the value which you want to enter by scrolling
UP/DOWN buttons.
Press SET button, SEC menu is displayed. (New value is entered but
it is not executed yet. In order to set the new value, please follow
below steps.)
Press ESC button one by one until CAnC is displayed.
By using UP/DOWN buttons, find SAUE
Press SET button while SAUE is displayed. (If you press ESC button
or select "CAnC" option instead of "SAUE" new data is cancelled
and the previous data is set.)

Werbung

loading