Herunterladen Inhalt Inhalt Diese Seite drucken

Abrasive Blasting Operations - Contracor BlastRazor Z-100RCS Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Abrasive blasting operations.

4.1. Start up.
1.
Check all connections from compressor to the nozzle to ensure that they are properly
fixed (badly fixed air hose of the compressor cause a serious damage).
2.
Ensure that abrasive blasting machine is filled with abrasive.
3.
Ensure that the necessary safety measures for you and others are observed:
— protective equipment is used,
— purified air is fed to the helmet.
4.
Always check position of RC handle lever, which should be in the safety position with
the holder in vertical position
5.
Feed compressed air to the machine intake.
ATTENTION!
MACHINE MAXIMUM OPERATING PRESSURE — 10 bar.
6.
Close both ball valves at the RC valve.
7.
Ensure that there is no leak in the system. Air should come ONLY out of the vent
under the RC handle lever.
8
CONTRACOR
Version 1.7
®

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Blastrazor z-200rcs

Inhaltsverzeichnis