7.2.2 Install with By-pass Measuring Chamber PTP-MK
For the model PTP-MK, there are two installation methods:
Method 1: Full pass through by-pass installation
This method is to be used when the full air flow is passing through the
measuring chamber.
1. Connect the inlet of the chamber using a 6 mm teflon hose to your
system.
Note: The full flow must pass the measuring chamber. Ensure a
certain flow rate to get fast response time.
2. Connect the outlet of the chamber to your system using the 6 mm
hose quick connector.
See figure below for details.
14
PTP-MK
7 Installation
PTS+20/-100