Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Selection Of Power Rating; Reinstallation - clage DEX 12 Next L Gebrauchs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für DEX 12 Next L:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

7. Initial operation

STB
Multiple Power System MPS
®
The rated capacity is 11.5 kW at 230 V and
can be changed internally to 8.8 kW
Before making the electrical connection, fill the mains and the appliance with water
by carefully opening and closing the hot water tap in order to vent completely.
To ensure a maximum flow, remove any existing aerator from the faucet. Flush the
warm and cold water pipes each at least for one minute.
After every draining (e.g. after work on the plumbing system or following repairs to
SDB
the appliance), the heater must be re-vented in this way before starting it up again.
If the water heater cannot be put into operation, the temperature cut-out or the
pressure cut-out may have tripped during transport. Check that the power supply is
switched off and reset the cut-out, if necessary.

Selection of power rating

Only by authorised specialist, otherwise lapse of guarantee!
Upon first connection of the appliance to the supply voltage, select the maximum
power rating. Only after having set the power rating, the heater provides its standard
operation mode.
The maximum allowable power rating at installation site depends on the local situa-
tion. It is imperative to observe all data shown in the table "Technical specifications",
in particular the required cable size and fuse protection for the electrical connection.
Moreover, the electrical installation must comply with the statutory regulations of the
respective country and those of the local electricity supply company (Germany: DIN
VDE 0100).
1. Switch on the power supply to the appliance.
2. When switching on the supply voltage for the first time, the value "09" flashes in
the display. If not, please carefully read the note "Reinstallation".
3. Select the maximum allowable power rating depending on the local situation via
sensor keys (8.8 or 11.5 kW).
4. Select "P2" to confirm the setting.
®
5. Mark the set power rating on the rating plate.
6. After having set the maximum allowable power rating, the heating element will be
activated after approx. 10 – 30 sec of continuous water flow.
7. Open the hot water tap. Check the function of the appliance.
8. Explain the user how the instantaneous water heater works and hand over the oper-
ating instructions.
9. Fill in the guarantee registration card and send it to the CLAGE After-Sales Service
or use the online regis tration on our website (see also page 19).

Reinstallation

In case the appliance will be commis sioned again under different installation conditions
than during its initial ope ration, it may be necessary to adapt the maximum power rat-
ing.
A temporary short-circuit of the two pins
(see figure), will reset all heater parameters to works setting and lock the heating.
Value "09" flashes in the display until the maximum power rating has been selected.
This condition will maintain when activating and deactivating the supply voltage.
, e.g. with a screwdriver acc. to EN 60900
33
CLAGE
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis