Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Reinstallation - clage CEX 7-U Montageanleitung

Vorschau ausblenden Andere Handbücher für CEX 7-U:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

7. Initial operation

Before making the electrical connec tion, fill the mains and the appliance with
water by carefully opening and closing the hot water tap in order to vent com-
pletely.
To ensure a maximum flow, remove any existing aerator from the faucet. Flush
the warm and cold water pipes each at least for one minute.
After every draining (e.g. after work on the plumbing sys tem or following repairs
to the appli ance), the heater must be re-vented in this way before starting it up
again.
If the water heater cannot be put into operation, the temperature cut-out or the pres-
sure cut-out may have tripped during transport. If necessary, reset the cut-out.
1. Switch on the power supply to the appliance. The heating element will be activated
after approx. 10 - 30 seconds of water flow.
2. Open the hot water tap. Check the function of the appliance.
3. Explain the user how the instantaneous water heater works and hand over the
operating instructions.
4. Fill in the guarantee registration card and send it to the CLAGE after sales service or
use the online registration on our website www.clage.com.

Reinstallation

A temporary short-circuit of the two pins, e.g. with a screwdriver acc. to EN 60900 (see
figure), will reset all heater para meters to works setting.
21
CLAGE
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis