Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis
Locate the Electrical Service Panel and switch all applicable
3.
breakers to the OFF position.
Hold the Mount in the desired location, ensuring it is level,
4.
using a Spirit/Bubble Level. Avoid placing the Mount over
any Live Wires, identified in step 2.
Insert the Nails into the Slots, located along the top edge of
5.
the Mount.
Drive the Nails into the Drywall, using a Hammer.
6.
Note: Stop hammering if significant resistance is
encountered. Select a different location for the mount.
Follow the steps to attach the Equipment to the Mount,
7.
located in the User Manual.

Concrete (Solid/Blocks)

Determine the target position of the Mount, factoring in:
1.
Equipment Dimensions
Location of the Mounting Holes in the Equipment in
relation to the location of the Holes, located in the
Mounting Brackets and how this will impact the final
location of the Equipment
Dimensions and location(s) of any Nearby Object(s)
Adequate clearance is factored in for any/all adjustment
capabilities of the Mount
Mechanical, Electrical, and/or Plumbing Infrastructure
Scan the intended Mounting Location for Live Wires, using
2.
a Stud Finder with AC Current Detection. Mark the location
of any live wires, using a Pencil.
To view manuals, videos, drivers, downloads, technical drawings, and more visit www.startech.com/support
6
Inhaltsverzeichnis
loading

Inhaltsverzeichnis