Position the welded mesh, making sure that the ends coincides with the pool chaining
2.3
Fitting the Hung liner track
Once the peripheral chaining is dry, remove the 2 Hung blocks
Smooth out any roughness around the Hung liner locking track around the entire periphery of the pool.
Remove any dust and lay down 2 silicon beads before mounting the Hung liner locking track. This is
essential for ensuring leaktightness between the Hung track and the top of the pool wall.
2 silicon beads
Mount the Hung liner locking track
14/32
2021/06 - Indice de révision : E - Code : 25110
CONSTRUCTION & RÉNOVATION