Standard configuration with extensions: top mounting
• Designed for top mounting, for high or low level alarm. Suspend the probe vertically so
that it reaches into the process at the desired detection level.
Process Cautions
• The maximum allowable torque on a horizontally installed rod is 15 Nm.
• Keep unit out of path of falling material, or protect probe from falling material.
• Avoid areas where material build up occurs.
• Take into account material surface configuration when installing unit.
• Ensure tensile load does not exceed probe or vessel ratings
Mounting Instructions
Pointek CLS200/300 is available in three thread types: NPT, or BSPT (R), and BSPP (G)
sure the mounting connection threads are of the same type, then simply screw the device into
the process connection, and hand tighten.
Wiring
WARNING: All field wiring must have insulation suitable for at least
250 V.
Notes:
•
Only qualified personnel are authorized to install and operate this equipment in
accordance with established safety practices and standards.
•
The Protective Earth Terminal indicated by
ground.
•
All wiring must be done by qualified personnel in accordance with all governing
regulations.
•
The equipment must be protected by a 15A fuse or circuit breaker in the building
installation.
•
A circuit breaker or switch in the building installation, marked as a disconnect
switch, shall be in close proximity to the equipment and within easy reach of the
operator.
•
Use shielded twisted pair cable, wire gauge 20 AWG to 14 AWG (0.5 mm
2
2.0 mm
).
•
Maximum working voltage between adjacent relay contacts is 250 V.
•
Relay contact terminals are for use with equipment which has no accessible live
parts and wiring which has insulation suitable for at least 250 V.
1.
A
sanitary connection is also available.
7ML19985QY81
Pointek CLS200/300 (Standard) – QUICK START MANUAL
must be connected to reliable
50 mm
(2") min
1
. Make
2
to
Page EN-5