Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Mounting Location - Siemens Pointek CLS series Kurzanleitung

Füllstandschalter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24
• CLS200 pressure (vessel):
- rod version
- cable version
• CLS300 temperature
- rod/cable version
- high-temperature version–40 to +400 °C (–40 to +752 °F)
• CLS300 pressure (vessel):
- 1 to +35 bar, gauge (-14.6 to +511 psi g)
Power
General Purpose and Explosion Proof: 12 to 250 V AC/DC, 2 VA/2W max.

Installation

Notes:
• Installation shall only be performed by qualified personnel and in accordance with local
governing regulations.
• This product is susceptible to electrostatic shock. Follow proper grounding procedures.
• This housing may only be opened for maintenance, local operation, or electrical
installation.
• Before installing the instrument, verify that the environment complies with any restrictions
specified on the device nameplate.

Mounting Location

Notes:
• Keep the sensor at least 50 mm (2") away from any nozzle or tank wall.
• If multiple units are used, allow at least 100 mm (4") between them, to prevent interference
(mount diagonally if space is restricted).
• Do:
provide a sun shield to protect the transmitter from direct heat radiation.
• Do not:
exceed the permissible ambient temperature limits
• Do not:
mount Pointek CLS200/300 in locations subject to strong vibrations (if it can be
avoided).
Standard probe length: top or side mounting
vertical
normal process
level
High level alarm
• normally mounted into the vessel top, or
• through the tank wall at the detection level
Low level alarm
• mounted through the tank wall at the detection level
1.
At process connection.
Page EN-4
Pointek CLS200/300 (Standard) – QUICK START MANUAL
0 to 25 bar, gauge/365 psi, gauge/2500 kPa, gauge (nominal)
0 to 10 bar, gauge/150 psi, gauge/1000 kPa, gauge (nominal)
1
:
–40 to +200 °C (–40 to +185 °F)
normal process
level
horizontal
7ML19985QY81

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pointek cls200Pointek cls300

Inhaltsverzeichnis