1. In case a false ceiling is 264 mm and more, install the unit according to (1) "Fixing with Suspension Bolt".
2. Ceiling should be strong enough to avoid vibration and noise.
3. Perform piping and wiring connection work inside of the false ceiling after suspending the unit. Select a installation location and piping direction. Especially as for the existing ceiling,
perform piping and wiring work to the connecting positions for the pipe and wirings before suspending the unit.
4. Keep a service space and install a service access door in order to remove the service cover.
5. When refrigerant piping connection work at field site, pay attention to the connecting direction of the expansion valve kit according to the arrow of the label as shown in the figure T.