Inhaltsverzeichnis
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Documents and Markings Included
39
-
Required Tools and Materials (Not Supplied by Renson ® )
39
-
-
-
Mounting the Fixed Part of the Side Channel
45
-
Pre-Drilling and Securing the Fixed Part of the Side Channel
45
-
-
Securing the Mounting Profile
46
-
-
-
Securing the Box Laterally
47
-
Securing the Box Horizontally
48
-
Installing the Interior Profile
48
-
-
Assembling the Removable Part of the Side Channel
50
-
Installing the Upvc Zip Channels
50
-
Installing the Removable Part of the Side Channel
51
-
-
-
-
MDF- or Plasterboard Finish on Top
54
-
Finish on Top Using a Finishing Profile
54
-
-
-
Side Channel with In-Depth Profile and Tube Profile
55
-
-
Ventilation Flap Control
57
-
-
-
-
Technical Characteristics
57
-
Electrical Wiring : Modular Motorised Flap (0-10V)
58
-
Electrical Wiring : Motorised Flap (On/Off)
59
-
Electrical Wiring: PARALLEL - CONNECTED Motorised Flap (0-10V)
60
-
Electrical Wiring: PARALLEL - CONNECTED Motorised Flap (On/Off)
61
-
-
Manual Control (Crank)
62
-
-
Technical Specifications of the Motors
62
-
Electrical Connection Specifications
62
-
Connecting the Cable with UV-Resistant Sheathing (RR-F/RN-F)
63
-
-
Final Adjustment of Motor Endpoints
64
-
Adjusting the Upper Endpoint
64
-
Adjusting the Lower Endpoint
64
-
-
Replacing the Screen Fabric or Motor
66
-
-
-
Removing the (Click & Safe ® ) Fabric Roller Barrel
68
-
Replacing the Thermal Material and Inner Profile
68