Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Queen Pearl For Integrated Fitting - Coffee Queen QUEEN PEARL Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Installation Queen Pearl for integrated fitting

Installation must be carried out by a qualified fitter. CHILLER SYSTEM
INSTALLATION AND SITING: See page 12.
A
(Figure
1.
(Figure
2.
Installation of Queen Pearl for integrated fitting
1.
The machine must be placed on a flat surface that is
impermeable to water. The tap pillar shall be fitted on
material that has a high stress tolerance and is impermeable
to water.
2.
Install the machine using the supplied water filter, hose
connections, water hoses and gas dome.(If necessary, use a
spirit level).
3.
Installation in cabinet. NB The cooling unit must be
installed in a well-ventilated area that is at normal room
temperatur, (approx. 16°C - 28°C). Make sure air is able to
circulate freely around the cooling unit.
IMPORTANT!
The machine must be disconnected from the mains
before any work is carried out. Pull the mains cable from
the wall socket.
The end customer/ user is responsible for ensuring that
the water connection is compliant with the manufacturer's
instructions.
NOTE
WORKING WITH THE CONNECTIONS
Hold the connection and press the hose as far into
the connection's body as possible.
Disconnecting the John Guest connection
Push the grey ring out towards the connection and pull out
the hose.
If the water hoses need to be cut, make a straight cut in
order to prevent leakage.
Fitting the tap pillar.
4.
Fit the tap pillar (A) by drilling a 50mm diameter
hole in the bench top. See Figure 1.
5.
Screw the tap pillar into position using the
supplied fittings.
See Figure 2.
7.
WATER LINE

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis