5. Installation in the
circulation system
The Flockmatic
is supplied ready for installation on a panel for
®
wall mounting. The pump is preferably mounted at a height of
about 1.5 m on the wall. The container with
Quickflock Automatic Plus is placed directly under the
Flockmatic
pump in order to keep the Suction tube as short as
®
possible. Read the safety instructions on the label of the
container of Quickflock Automatic Plus. Do not dispense any
liquids other than liquid flocculant with this pump!
Mounting / Commissioning:
Install the injection valve using a saddle clamp if necessary
the pipe section between
the circulation pump and the filter
inlet.
(See diagram).
Caution:
Place the point of injection as far as possible away from the
sand filter
(as close as possible to the circulation pump
in order to allow the flocculating agent to build up the flakes.
If a measurement, control and metering system is installed
make sure to inject the liquid flocculant after the sample water
extraction point.
Connect the pressure side of the pump (right hand) with the
injection valve by using the provided hose 6 x 4 mm. Connect
the hose to the supplied suction lance on the suction side of the
Flockmatic
(left hand).
®
Make sure all hose connections are fitting tightly!
Installation diagram:
1 - Flockmatic
®
2 - Quickflock Automatic Plus
3 - Heat exchanger
4 - Filter
5 - Injection after the circulation pump
6 - Circulation pump
7 - Injection before circulation pump (recommended if counter
pressure is higher than 0.8 bar)
PLEASE NOTE: Sample water extraction must be before
injection of liquid flocking agent!

6. Maintenance

Some parts of the Flockmatic
chemical and mechanical stress. Thus regular inspection is
required for safe, long-term operation. Regular preventive
maintenance of the system protects against unscheduled
interruptions of operation.

6.1 14-day maintentance

• Visual inspection of all dosing lines and the dosing hose
for leaks, replace if necessary

6.2 Yearly maintenance

• inspection of all dosing lines, replace if necessary
in
• Replacement of the hose of the dosing pump

6.3 Cleaning

Clean the surfaces of the device with a soft lint-free cloth as
needed. To do this only use a little water, if necessary
outlet)

6.4 Hose replacement

are subject to wear due to
®
IMPORTANT NOTE
Do not use aggressive cleaners
NOTE
Never grease the hose!
NOTE
Only use original spare pump hoses!
DANGER!
Danger due to chemicals
When pulling off the pump hose, corrosive
product residues can escape.
Possible consequence: Serious health
impairment (acid burns) and damage to
material assets
Always empty the pump hose and supply
lines first.
If necessary wear protective goggles and
protective gloves and protect the
surroundings against escaping product
residues with a cloth.
DANGER!
Danger due to rotating parts
The rotor of the dosing pump can start-up
abruptly.
Possible consequence: Danger of
crushing for fingers!
Ensure that the dosing pump remains
disconnected from the operating voltage while
replacing the hose (unplug the mains plug)!
11

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Bayrol Flockmatic

Inhaltsverzeichnis