Herunterladen Inhalt Inhalt Diese Seite drucken

Inspection; Maintenance Recommendation; Disassembly, Disposal; Spare Parts - haacon 2931 Betriebsanleitung

Spindelheber
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

10. inspection

The equipment must be inspected in accordance with the con-
ditions of use and the operating conditions latest after 50 leve-
ling procedures at least once per year by an authorised person
per TRBS 1203 (Technical expert) (testing per BetrSichV, §10,
sect. 2 represents implementation of EC Directives 89/391/EEC
and 2009/104/EC and the annual occupational safety inspec-
tion per DGUV-V 54, §23, sect. 2 and DGUV-G 309-007).
These inspections must be documented:
– Before commissioning.
– After significant alterations before recommissioning.
– Latest after 50 leveling procedures.
– At least once per year.
– In the event of unusual occurrences arising that could have
detrimental effects on the safety of the support (extraordinary
tests, e.g. after a long period of inactivity, accidents, natural
events).
– After repair works that could have an influence on the safety
of the supports.
Technical experts are persons, who have sufficient knowledge
based on their specialist training and experience, in the areas of
winches, lift and pull systems and the relevant official occupa-
tional health and safety rules, accident prevention regulations,
guidelines and generally accepted engineering rules (e.g. EN
standards), to evaluate the operational safety of winches, and
lift and pull systems. Technical experts are to be nominated by
the operator of the equipment.
In every 10th inspection, at the latest however, after 10
years, a major overhaul of the leveling device must occur. In
this process, the spindle supports will be disassembled and the
condition of all components has to be examined.
Wear parts and components relevant for safety have to be
exchanged in every case. Operational worn components will
be substituted. We recommend to charge haacon hebetechnik
gmbh with the conduction of this major overhaul.
This inspection may be carried out only by people who are
authorised by the manufacturer haacon hebetechnik gmbh
and who are trained in dealing with this leveling device and its
components.
094017_f_gb_spiheb_v
haacon hebetechnik gmbh – Phone +49 (0)9375 - 84-0 – Fax +49 (0)9375 - 8466

11. Maintenance recoMMenDation

The operator determines the intervals themselves based on
frequency of use and the operating conditions.
– Regular cleaning, no steam jets!
– General overhaul by the manufacturer after 10 years at the latest.
CAUTION!
Only perform inspection, maintenance and repair work on
an unloaded hoist. Only allow work on safety components
to be performed by qualified specialist personnel.
Maintenance and inspection work
Visual and functional tests
Brake function under load
Relubrication (lubricating nipple), while doing
so deploy and retract the unit over its full stroke
length
Check type plate for legibility and replace if
necessary
Professional inspection according to DGUV-V 54
Check gear parts, replace if necessary, lubricate
Lubricant recommendations:
Grease per Gleitmo 805K (Fa. Fuchs Lubritech).

12. DisasseMbly, Disposal

– Make sure to observe the safety instructions.
– Dispose of the equipment and the substances within it in an
environmentally responsible manner.

13. spare parts

Please quote the following to order spare parts:
Type:
– See model plate
Serial No:
– See model plate
Part No:
– See spare parts list / drawing
Description: – See spare parts list / drawing
intervals
Before
every use
Every 6
months
Annually
Every
5 years
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

200411232630233449

Inhaltsverzeichnis