Herunterladen Diese Seite drucken

Kingspan TRZ Plus 2A Technische Information Und Bedienungsanleitung Seite 51

Rwa treppenraumzentrale

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Connecting diagram magnetic clamps / magnetic locking
All work to be carried out without mains supply (230 V AC) or any batteries connected. Route the connecting cables into
the control panel housing at the top. Connect all connecting cables according to the wiring diagram and make sure that
control panel or of the external components. The notes and installation directives in the technical documentation are
always to be observed.
Magnetic locking*
Magnetic clamp*
one magnetic clamp / magnetic locking
Junction box
Magnetic clamp
* see page 61, DIP-Switch 3 = ON
15/24999513
SHE control panel TRZ Plus 2A and TRZ Plus Comfort;
Compact control panel 2A and Compact control panel 2A/M
Magnetic locking*
Magnetic clamp*
several magnetic clamps / magnetic lockings
Junction box
Last magnetic clamp
Magnetic clamp 1
Window closed
Opening via spring force of the
1
gas spring
The door is
kept open by
magnetic clamp
Closing via spring force of the
2
door closer
Monitoring diodes
51

Werbung

loading

Verwandte Produkte für Kingspan TRZ Plus 2A

Diese Anleitung auch für:

Trz plus comfort