Herunterladen Inhalt Inhalt Diese Seite drucken

GARDY SHELTER PLUS Aufbauanleitung Seite 42

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
ENGLISH
CODES
PART DESIGNATION
M
Bituminous felt
P
Patch for fixing bituminous felt
Q
Patch under the battens
Lay the bitumen felt (part M). Handle it carefully (ideally wearing gloves) to avoid tearing it.
First cover the two edges (front and back) and then move towards the center of the roof,
while remembering to overlap all the previously laid strips. Then attach the fixing patches
(part P) to the edges of the strips using SC1 screws. Then fix the patches under the battens
(part Q) with SC1 screws, bending the felt under the battens - see detailed drawing. This
prevents the roofing felt from tearing and provides a good base for the roof waterproofing.
ASSEMBLY OF FINISHING ELEMENTS
CODES
PART DESIGNATION
N
Facade moulding
R
Diamond-shaped finish
Then install the front and back facade mouldings (part N) and the decorative diamond-
shaped finish (part R) using screws SC2.
N
R
DIMENSIONS (MM)
Strips 4,4 m
40 x 15 x 2620 mm
40 x 15 x 2140 mm
R
N
DIMENSIONS (MM)
20 x 95 x 2640 mm
20 x 105 x 200 mm
QTY
7
10
4
QTY
4
2
42

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ccp-eko 5040283371

Inhaltsverzeichnis