Herunterladen Inhalt Inhalt Diese Seite drucken

EAS ELECTRIC ECMV2-Serie Bedienungsanleitung Seite 79

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 190
7. Thread this pipeline through the wall
and connect it to the outdoor unit.
8.
Insulate all the piping, including the
valves of the outdoor unit.
9.
Open the stop valves of the outdoor
unit to start the flow of the
refrigerant between the indoor and
outdoor unit.
CAUTION
Check to make sure there is no
refrigerant leak after completing the
installation work. If there is a refrige-
rant leak, ventilate the area immedia-
tely and evacuate the system (refer to
the Air Evacuation section of this
manual).
Installation Of The Throttle (some models)
1
Throttle
2
Liquid pipe
3
Gas pipe
1
2
3
Precautions
For
ensuring
please mount the throttle as horizon-
tally as possible.
Indoor
Indoor
Indoor
Wrap the supplied anti-shock rubber
at external of the throttle for denoise.
1
2
1
Anti-shock rubber
2
Throttle
33
throttled
efficiency,
Outdoor
Outdoor
Outdoor
V.2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis