3.0 — Assembly Instructions
3.1 — Preparation
Before starting to pump up the STRYVE
Ball, you should insert the PVC inner ball
into the cover.
Unzip the cover and insert the PVC inner
ball so that the hole is pointing towards the
underside of the cover.
EN
20