Herunterladen Inhalt Inhalt Diese Seite drucken

Daikin EKSRDS2A Bedienungs- Und Installationsanleitung Seite 17

Solar-druckstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
ELECTRIC SHOCK CAUSED BY LIVE PARTS
Disconnect the mains voltage supply before performing the work and
ensure that it cannot be switched on.
Verify that no hazards can be caused by electrically conductive objects
or media.
Failure to follow these instructions will result in death or serious
injury.
SUPPLY VOLTAGE FLUCTUATIONS
The pump electronics can be damaged by voltage fluctuations.
Verify that the pump is not controlled via an external speed controller
which changes the supply voltage.
Verify that the pump is controlled with 230 V without phase angle control.
Switch the pump on and off via the controller.
Failure to follow these instructions can result in equipment damage.
1. Connect the circulation pump in accordance with the instructions of the
manufacturer.
2. Route the connection cable of the circulation pump through the cable duct
to the bottom and connect it to the solar controller.
- Observe the operating instructions of the solar controller.
Use a shielded cable 3 x 1.5 mm² and up to Ø 10 mm to extend the connec-
tion cable.
EKSRDS2A
DAIKIN Solar pressure station
4P699231-1 – 2022-06
DANGER
NOTICE
Mounting
Operating and installation instructions
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis