15 Hand over document
After the installation of the equipment pass the installation and mainte-
nance documents to the operator. The operator has to receive the hand
over documents. The complete filled and signed hand over document
should be sent to the supplier.
Art.-No.:
Type of item: Space Cabin
Serial number: _________________________________________________
Customer or operator (Town, Town council, Kindergarten, etc.):
______________________________________________________________
______________________________________________________________
Competent person in charge:
______________________________________________________________
______________________________________________________________
Installation company (address):
______________________________________________________________
______________________________________________________________
Responsible assistant (assembler):
______________________________________________________________
______________________________________________________________
Received the complete assembly instructions, maintenance instructions and
maintenance print out .
______________________________________________________________
(Signature of operator)
(Stamp)
Date: ___________________
F:\Montageanleitung englisch\Raumkapsel 20_01_020-01-en-010.doc
SPOGG Sport-Güter GmbH • 35614 Aßlar/Berghausen • Germany
spogg@hally-gally-spielplatzgeraete.de
20.01.020
(Signature of installation company)
• www.hally-gally-spielplatzgeraete.de
- 27 -