Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation For Operation - FROMM & STARCK STAR ATFE 15 Bedienungsanleitung

Höhenverstellbarer schreibtisch mit tischplatte
Vorschau ausblenden Andere Handbücher für STAR ATFE 15:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
3.2.
POSITIONING OF THE UNIT
The ambient temperature should be between 0 and 40°C and the relative humidity
should not exceed 85%. Place the unit in a way that ensures good air circulation.
Keep the unit away from any hot surfaces. Always operate the unit on a level,
stable, clean, fireproof and dry surface and out of the reach of children and
persons of impaired mental, sensory and intellectual functions. Place the unit in
such a way that the mains plug can be reached at any time. Ensure that the power
supply to the unit corresponds to that specified on the identification plate!
ASSEMBLY OF THE UNIT
Step 1: Installing the lifting column
Install the lifting column (2) to the tabletop (1), as follows:
a) Insert the hexagonal stem of the column into the gear hole.
b) Rotate the column to engage the hooks on the corners of the support with the
rack screws.
c) Use an Allen key (C), to tighten the screws (A).
d) Make sure the lifting column is in position as shown (the longer side of the
column is parallel to the shorter side of the tabletop).
Step 2: Installing the bottom supports
Mount the bottom supports (4) to the lifting columns (2) with screws (B) and tighten
with a 4x4 Allen key (C).

Preparation for operation

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis