Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Switching the device off
Press and hold the ON/OFF button for 2 seconds to switch the device off.
Gas concentration measurement
After previous pressure tests located the possibly leaking pipe section, empty the
section completely (if possible). It is recommended to blow out the pipe section using a
compressor. Next fill the pipe using sample gas (forming gas 95/05). The sample gas
will escape at the leak location and can be measured using the TGO 200 in close
proximity of the leak.
Position the gas sensor head (using the goose neck extension as needed) as close as
possible to the affected pipe. We recommend to initially measure open areas (joints,
door frames, open jointing etc.). In direct proximity of the leak, the TGO 200 measures
the highest gas concentration. This is indicated by a high reading on the LED display
with dynamic bar graph (red LEDs are illuminated) and an acoustic beep.
Any questions? We are here for you!
Your HEYLO Customer Service:
Tel.
+49 (0) 42 02 – 97 55 15
Fax
+49 (0) 42 02 – 97 55 97
Email service@heylo.de

5. Spare parts list

HEYLO-Item No. Description
1430080
LSK-200 case
1430081
modulator LOS 200
1430083
cables with clamps for LOS 200
1430085
cables with schuko socket for LOS 200
1430090
charger for LOS 200
1430082
receiver LOE 200
1430084
sound location of leakage AHO 200
1430086
headset for AHO 200
1430091
remote switch for AHO 200
1430092
extension (45 cm) for AHO 200
1430093
test prod (8 cm) for AHO 200
1430087
gas locating TGO 200
Pr
21
EN

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für HEYLO LSK 200

Diese Anleitung auch für:

Los 200Tgo 200Aho 200Loe 200

Inhaltsverzeichnis