Herunterladen Inhalt Inhalt Diese Seite drucken

Environmental Protection; Declaration Of Conformity - Kress KUC61 Originalbetriebsanleitung

Akku-bohrhammer li-ionen bürstenlos
Vorschau ausblenden Andere Handbücher für KUC61:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 11
2. REASONS FOR DIFFERENT BATTERY PACK
WORKING TIMES
Charging time problems, having not used a battery
pack for a prolonged time will reduce the battery pack
working time. This can be corrected after several
charge and discharge operations by charging &
working with your drill. Heavy working conditions such
as large screws into hard wood will use up the battery
pack energy faster than lighter working conditions. Do
not re-charge your battery pack below 0
30
C as this will affect performance.
o
MAINTENANCE
REMOVE THE BATTERY PACK FROM THE TOOL
BEFORE CARRYING OUT ANY ADJUSTMENT,
SERVICING OR MAINTENANCE.
Your power tool requires no additional lubrication or
maintenance. There are no user serviceable parts in
your power tool. Never use water or chemical cleaners
to clean your power tool. Wipe clean with a dry cloth.
Always store your power tool in a dry place. Keep
the motor ventilation slots clean. Keep all working
controls free of dust. Occasionally you may see sparks
through the ventilation slots. This is normal and will
not damage your power tool.
ENVIRONMENTAL
PROTECTION
10
Waste electrical products must not be disposed
EN
of with household waste. Please recycle where
facilities exist. Check with your local authorities or
retailer for recycling advice.
DECLARATION OF
CONFORMITY
We,
Positec Germany GmbH
Grüner Weg 10, 50825 Cologne, Germany
Declare that the product
Description Lithium-Ion Brushless Rotary
C and above
o
Hammer
Type KUC61 KUC61.2 KUC61.91(C61-
designation of machinery, representative of
hammer)
Function Hammering various materials
Complies with the following Directives:
2006/42/EC
2011/65/EU&(EU)2015/863
2014/30/EU
Standards conform to
EN 55014-1
EN 55014-2
EN 60745-1
EN 60745-2-6
The person authorized to compile the technical file,
Name Marcel Filz
Address Positec Germany GmbH
Grüner Weg 10, 50825 Cologne, Germany
2020/05/25
Allen Ding
Deputy Chief Engineer, Testing & Certification
Positec Technology (China) Co., Ltd
18, Dongwang Road, Suzhou Industrial
Park, Jiangsu 215123, P. R. China

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kuc61.2Kuc61.91

Inhaltsverzeichnis