9 Commissioning

9 Inbetriebnahme

9 Commissioning
Warning!
Before commissioning, the safety in-
structions must, without fail, be read,
understood and then observed!
An incorrectly set parameter can,
under some circumstances, result
in oscillation of the controller and
destruction of the motor. It is recom-
mended that current limits and con-
trol parameters are initially set to low
values and then carefully increased
in small steps.
Failure to follow them can result in danger to persons
or damage to the machine.
All drives of the series BG 65 MI are applied for cu-
stomer projects, this requires a special commissioning
manual depending on the customzid programming of
the drives.
18
All manuals and user guides at all-guides.com
Instruction Manual/Betriebsanleitung BG 65 MI, Version: 1.3 en_de
© 2008 Alcatel-Lucent; Dunkermotoren; D-79848 Bonndorf; Germany
9 Inbetriebnahme
Achtung
Vor der Inbetriebnahme sind unbe-
dingt die Sicherheitshinweise zu le-
sen und zu beachten!
Ein falsch eingestellter Parameter
kann unter Umständen zum Schwin-
gen des Reglers führen und den
Motor zerstören. Es empfiehlt sich,
Stromgrenzen und Reglerparameter,
von kleinen Werten beginnend vor-
sichtig zu erhöhen.
Eine Nichtbeachtung kann zu Gefahren an Personen
oder Beschädigungen an der Maschine führen!
Da die Antriebe der Baureihe BG 65 MI für Kundenpro-
jekte von Dunkermotoren appliziert werden, muss für
die Inbetriebnahme in Abhänigkeit der kundenspezi-
fischen Programmierung eine spezielle Bedieneinwei-
sung erstellt werden.
: