Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Part 1 General Control Feasibility's - FAMOS Roto Sealer F 220-Serie Bedienungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

In order to guarantee a correct functioning, we advise to install the sealer at a spot:
- where the machine has enough space for ventilation.
- where it is not exposed to direct sunlight or some other heatsource.
- where it is not subject to vibrations or shocks.
- that is dustfree.
Check if the on/off switch is off.
Connect the mains lead to the sealer first and than to an earthed socket with the correct
Mains voltage (according to type label at the rearside of the sealer).
Switch on the on/off switch.
During the heating-up the machine will mention in the display that the temperature is too low.
From the off-situation onwards it takes ± 5 minutes before the pre-set temperature (at 180°) is reached.
Two bleeps indicate that the adjusted temperature is reached.
The display will show the stand-by screen.
Feeding packages is possible now.
RS 232 poort
Printerpoort
Typeplaatje
Netentree
Zekeringen 2x 3.15AT
Aan/uit schakelaar
2) Part 1: General control feasibility's
99.900.121 rev.:1
All manuals and user guides at all-guides.com
REMARK
46
Instelknop van de invoergeleiding
t.b.v. de sealnaadpositie

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Roto sealer f220dep

Inhaltsverzeichnis