Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Guidelines - resideo Braukmann CBU142 Einbauanleitung

Einzelpumpen-sicherheitstrennstation;
Vorschau ausblenden Andere Handbücher für Braukmann CBU142:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

5

Installation Guidelines

5.1 Testing before set-up
WARNING!
Installation on non-level and non-structural
installation sites
Personal and property damage!
Ensure sufficient compressive strength according to
class C12/15 for concrete in the exposition class X0
according to EN 206-1.
Installation location has to be horizontal
Observe the weight
NOTICE
Sufficient noise insulation for the building is
ensured due the compact booster unit`s safety
store.
NOTICE
Do not operate the compact booster unit near living
rooms and
bedrooms.
Check the following points prior to installation:
Inspect the building architecture and prepare it
according to the dimension sheet.
According to specifications on the type label, the
system is suitable for the electric supply network.
Frost-free installation location
Lockable installation location
Well ventilated installation location
A sufficiently dimensioned dewatering connection
(drain connection or similar) is required (observe EN
12056).
If available, observe the creep resistance of the
compensator.
Compensators have to be able to be easily replaced.
5.2 Installation compact buster unit
WARNING!
The compact booster unit is top heavy.
Danger of injury of overturning of the compact booster
unit
Secure the system so that it cannot tip over before it
has been permanently anchored.
Anchor the system securely to the foundation.
To avoid the transfer of pipeline forces and structure-
borne sound to the compact booster unit, it is
recommended to install compensators with a tie bar.
Packaging is removed
Suitable location is selected according to specifications
For service work there is sufficient space in all directions.
GB
1.
Mark the installation holes on the floor as desribed in
the data sheet.
2.
Drill holes (maximum Ø12 mm).
3.
Insert suitable, proper sized dowels.
4.
Position the system for installation.
5.
Anchor the system solidly to the foundation with
adequate bolts.
5.3 Connecting pipeline
CAUTION!
Airbag formation in the suction line
Compact booster unit can not suck in any medium!
Install the pipeline rising
1 Suction mode
Fig. 2 Correct connection of the pipeline
The use of compensators with tie bars is recommended.
1.
Always install pipelines so that they are free of
tension.
2.
Pipeline with discharge pressure lines with the
distribution lines on the backfeed and discharge side.
5.3.1 Installation of pipeline compensator
DANGER!
Sparks and radiant heat
Fire hazard!
Take appropriate measures to protect the
compensator during welding work in the vicinity.
CAUTION!
Leaky compensator
Flooding the installation room.
Check regularly for rips and blisters, exposed material
or other defects.
The compensator is provided with a structure-borne sound
insulation to intercept the length limitation to absorb any
reaction forces.
1.
Install the compensator in the pipeline without tension.
2.
Fasten bolts equally cross-wise.
3.
Do not paint the compensator and always protect it
against oil.
4.
The compensator has to be accessible on the
compact booster unit at any time for inspection
purposes and for this reason should not be included in
the pipe insulation.
5.
The compensator is subject to wear.
8
MU1H-1382 GE23 R0521

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Braukmann cbu142fuCbu142-32a-065

Inhaltsverzeichnis