6.3 Decommissioning

6.3.1 Switch off

Version without speed control:
1.
Pull out the electrical mains plug
Version with speed control:
1.
Press the Start/Stop button of the frequency inverter
• The pump unit stops, the green operation LED
disappears
2.
Pull out the electrical mains plug
6.3.2 Procedures for shutting-down
The compact booster unit is disconnected from the power
supply.
1.
Close ball valve
2.
If available, connect the inlet to the tank.
3.
Open drain plug 1 and empty the tank.
Fig. 3 Open drain plug
Example CBU142
1
Drain plug
7

Operation

CAUTION!
Improper operation
Damage to the pump system!
Ensure that all local requirements are achieved, in
particular the Machinery Directive and the Low-
Voltage Directive.
Check electrical wiring before start-up.
MU1H-1382 GE23 R0521
GB
7.1 Pump control unit
Version without speed control:
1
2
3
1 The green light goes on to signal standby mode.
2 The red light comes on in case of water shortage or
malfunction.
3 Reset-function
4 Mains cable
(Diameter 11.5 mm)
Fig. 4 Pump control unit (outside)
1 Clamps on the motor
2 Adjustment screw for precharge pressure
3 Clamps on the mains cable
Fig. 5 Pump control unit (inside)
Version with speed control:
An app is available for specially trained service
personnel to connect to the drive is available. This app
can be purchased in the Google Playstore or iOS
Appstore.
The frequency inverter is motor-mounted and self-cooling. It
is equipped with the following indicators:
11
4
2
1
3

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Braukmann cbu142fuCbu142-32a-065

Inhaltsverzeichnis