Herunterladen Inhalt Inhalt Diese Seite drucken

Set-Up 5; Checking The Scope Of Delivery; Checking The Assembly And Installation Prerequisites; Installation - Vaillant VR 100 Installationsanleitung

Vorschau ausblenden Andere Handbücher für VR 100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 Set-up

5.1 Checking the scope of delivery

2
Check that the scope of delivery is com-
plete and intact.
Num-
Designation
ber
1
Communication unit
1
Wall bracket
1
Bag with bolts and wall plugs
1
Clamping screw
1
Line
1
Cable bracket
5.2 Checking the assembly and
installation prerequisites
1. Check whether the communication unit
is compatible with the heat generator
and the room thermostat in the installa-
tion. (→ Page 14)
2. When choosing the installation site,
pay attention to the dimensions of the
communications unit.
Technical data (→ Page 20)

6 Installation

6.1 Qualification

Only qualified electricians may carry out
the electrical installation.

7 Electrical installation

7.1 Connecting to the heat
generator
3
1. Switch off the power supply to the heat
generator.
2. Connect the communication unit to
the heat generator using the enclosed
cable.
3. Consult the boiler's installation instruc-
tions in order to determine the affected
0020282111_00 VR 100 Installation instructions
connection terminal X31 and its posi-
tion.
7.2 Connecting to the
communication unit
1. Unclip the unit mounting bracket from
the communication unit.
2. Connect the enclosed cable (1) to the
communication unit and, in doing so,
observe the colour code on the sticker
(2) below the plug connection (3).
– The colours of the wires must match
the colours on the sticker
3. Re-establish the power supply to the
heat generator.
7.3 Requirements for the
installation site 6,
1. Avoid interference between the com-
munication unit and its environment
(magnetic fields, electrical units, metal
structures, etc.).
2. Determine a location in order to start
the search.
3. To determine the best possible signal
strength for the mobile network, move
the communication unit in order to de-
termine the installation site.
4. Each time you move the communica-
tion unit, wait for 10 seconds in order
to test the signal strength of the mobile
network.
Condition (signal strength of the of the
mobile network/communication with the
server): Meaning of the network LEDs
(→ Page 18)
The illuminated LEDs display the
signal strength of the mobile net-
work.
The LEDs automatically go out after
30 minutes. The signal strength of
the of the mobile network is then no
longer updated.
5. Mark the drill holes.

Set-up 5

4
5
15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

0010025650

Inhaltsverzeichnis