Herunterladen Inhalt Inhalt Diese Seite drucken

Husqvarna ST 224 Bedienungsanweisung Seite 9

Vorschau ausblenden Andere Handbücher für ST 224:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
A
D
E
To install the chute deflector and
chute rotator head
1. Put the chute deflector assembly on the top of
the chute base with the discharge opening in the
direction of the front of the product.
2. Put the chute rotator head (A) on the chute
bracket (B). Rotate the chute assembly to align
the pins under the chute rotator head with the
holes in the chute bracket if it is necessary.
3. Put the chute rotator head on the pin (C) and the
threaded stud (D) on the mounting bracket (E).
4. Attach a locknut (G) on the threaded stud and
tighten.
A
1481 - 004 - 14.04.2021
C
G
F
B
D
C
E
5. Put the cables through the cable guide (F), if
equipped, and the double clip (I) to attach the
rotator cable (H) to the lower handle.
I
To install the chute deflector remote
control
1. Attach the remote cable bracket (A) to the
discharge chute with a carriage bolt (B) and a
5/16-18 locknut (D). Tighten the bolt.
2. Install the remote cable eyelet (E) to the chute
deflector (F) with a shoulder bolt (G), a nylon
washer (C), and tighten with a ¼-20 locknut (K).
The cable eyelet will be loose on the shoulder
bolt.
3. Attach the spring (L) between the hex nut (M) on
the chute rotator head and the hole on the chute
deflector.
G
C
E
K
D
A
4. Attach the lever control knobs (N) by pressing
them down on the control levers (O).
H
F
F
L
M
B
9

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

St 227St 230

Inhaltsverzeichnis