Herunterladen Inhalt Inhalt Diese Seite drucken

Husqvarna ST 224 Bedienungsanweisung Seite 19

Vorschau ausblenden Andere Handbücher für ST 224:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
2. Remove the wooden block from below the
product.
3. Lift the handle to tilt the rear section up. The front
section will tilt back and pivot to attach the rear
section.
4. Make sure that the belt is put in the auger pulley
groove correctly.
5. Install the 5/16'' bolts (A), (C) and tighten (8-12
Ft.Lbs / 11-16 Nm).
6. Install the ¼'' bolts (B) and tighten (4-6 Ft.Lbs /
5-8 Nm).
7. Install the auger belt on the engine pulley. Make
sure that the belt is put correctly around the idler
pulley and installed correctly in the engine pulley
groove.
8. Operate all controls to make sure that the auger
belt is installed correctly and that all components
are moving correctly.
To adjust the tension of the cable for
the discharge chute deflector
1. Loosen the jam nuts (B) to adjust the tension of
the cable for the discharge chute adjacent to the
adjuster turnbuckle (A).
A
2. Hold the short section and turn the long section
to increase the adjuster.
1481 - 004 - 14.04.2021
A
C
B
B
C
3. Adjust until the cable for the discharge chute
deflector (C) has a tight fit. Tighten the jam nuts.
To adjust the auger control cable
Note: If you do not feel comfortable making this
adjustment yourself, please contact an authorized
service center. Adjustments can be needed if the
impeller and auger rotation is sluggish when
engaging the auger control lever, or if the auger belt
has been replaced.
1. Loosen the jam nuts (B) next to the turn buckle
(A) to adjust the cable tension in the auger
control cable (D).
A
2. Hold the short section and turn the long section.
Turn it 360 degrees.
3. Test the auger engagement. Repeat the
adjustment until only a small amount of tension
remains in the cable when the lever is
disengaged.
4. Tighten the bottom jam nut to lock in the tension.
5. Ask an assistant to stand 10 feet / 3 meters in
front of the product, on the opposite side of the
chute. The assistant observes the rotation of the
auger and measures the time it takes for the
auger to stop rotating after the lever is released.
If the auger stops rotating after 5 seconds, adjust
the cable by rotating the center barrel 360
degrees, to contract the adjuster. Test the auger
engagement and measure the stop time again. If
the auger stops rotating in less than 5 seconds,
continue with the next step.
6. Tighten the jam nut on the auger cable.
Note: If the adjustment does not resolve the
problem, replace the auger belt. See
the auger belt on page 18 .
To remove the wheels
1. Remove the wheel pin (A) and the retainer pin
(B).
2. Remove the wheel from the axle (C).
B
D
To remove
19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

St 227St 230

Inhaltsverzeichnis