Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Assembly; Operation Instructions; Operating - Zipper Maschinen ZI-CWP750N Betriebsanleitung

Klarwasserpumpe/regentonnenpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

13

OPERATION

13.1 Assembly

Screw the hose adapter (5) into the pump outlet
Fix a hose to the hose adapter.
The hose adapter can be trimmed to suit the selected hose
connection.
Mount the suspension bracket (if fitted) and adjust the length.

13.2 Operation instructions

Perform all machine settings with the machine being
disconnected from the power supply!
Make sure that the immersion pump is standing securely or
operate the immersion pump suspended from a rope.
Make sure there is adequate clearance under the pump.
Never allow the immersion pump to run against a closed off
hose line.
When using in shafts, make sure the size is adequate.
Always cover the shaft with a secure footplate.
The immersion pump switches on automatically using the float
switch when a specific water level has been reached, and
switches off again if the water drops below the switch-off
height.
Recommended cable length on the float switch approx. 120
mm.

13.3 Operating

Unwind the connection cable (2) completely.
Make sure that the electrical plug connection is mounted in
the area safe from flooding.
Change the terminal position and adjust the switching
points of the float switch (6) individually.
Attach the cable on the float switch to the pump housing
securely.
Immerse the immersion pump in the conveying medium
slowly. Hold the immersion pump at a slight angle to allow
any air to escape.
Insert the mains plug into the plug socket.
To switch off remove the mains plug from the plug socket.
ZIPPER MASCHINEN GmbH
www.Zipper-Maschinen.at
ZI-CWP750N / ZI-RTP350
W A R N I N G
OPERATION
15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Zi-rtp350

Inhaltsverzeichnis