Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Ultimaker 2+ Connect Air Manager Schnellstartanleitung

Vorschau ausblenden Andere Handbücher für 2+ Connect Air Manager:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
Install the Air Manager
Turn off your Ultimaker 2+ Connect before installing the Air Manager.
1.
Align the filter housing
2.
Guide the Bowden
with the back of the
tube and print head
Ultimaker 2+ Connect
cable into the slot
4.
Gently push the
5.
Place the cover over the
filter completely into
filter housing and align
the filter housing
it with the top panel
3.
Push down on the filter
housing until it clicks
firmly into place
6.
Connect the Air
Manager cable to the
port at the back of
the Air Manager and
secure with the clip
The Ultimaker 2+ Connect and Air Manager must be positioned out of direct sunlight when in use.
Ensure there is at least 10 cm of free space at the back of the Air Manager for unrestricted airflow.
7.
Guide the Air Manager
8.
Plug the cable into
cable around the left
the OUT port at
side of the spool holder
the back of the
Ultimaker 2+ Connect
10.
Push the handle against
The front enclosure
the panel; the magnet
can be placed against
will hold the front
the Air Manager
enclosure in place
EN
9.
Take the front
enclosure and place
the hinge profile on
the front panel

Operation

When a print has finished,
wait until the printer has
completely cooled down.
This will allow sufficient
time to filter all particles
from the printing process.
Then remove the front
enclosure so you can take
the finished print from
the build plate.

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Ultimaker 2+ Connect Air Manager

Inhaltsverzeichnis