Herunterladen Inhalt Inhalt Diese Seite drucken

Oyster Vision III Montageanleitung Seite 19

Inhaltsverzeichnis

Werbung

Do not tighten the union nut of the elbow fi tting before having adjusted the length of the cable on the roof*.
Dealing of the lead - through roof
Sikaflex on
screws and
screw nuts
Important:
After sealing and drying -
verify the impermeability!
d) Use the sealing compound to seal all around the lower edge of the threaded
elbow joint and the self-tapping screws.
e) The cable can be coiled up if it is too long inside the vehicle.
Check the cable inlet, the self-tapping screws and the foot of the threaded elbow fi tting for leaks.
Sikaflex
all around
*Cabel length to adapt
on the roof
19

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Oyster Vision III

Inhaltsverzeichnis