Herunterladen Inhalt Inhalt Diese Seite drucken

VALLONE COMO 08 Montageanleitung Seite 7

Vorschau ausblenden Andere Handbücher für COMO 08:
Inhaltsverzeichnis

Werbung

COMO 08
D
EN
1
2
1/2"GAS
EN
M O U NT I NG INS T RUC T I ONS
• Remove the cover plate (1) of the flush-mounted box COMO U5.
• Screw the thread adapter (2) onto the ½" gas thread of the flush-mounted box.
• Put the collar (4) onto the threaded rod (3) up to the middle elevation.
• Wrap the thread with Teflon tape or hemp.
• Screw the threaded rod (3) with the collar (4) onto the thread adapter (2) until the
collar (4) is firmly set on the wall.
• Now put the spout (5) onto the protruding part of the threaded rod.
• Fasten the spout (5) with the grub screw (6) using the hex key (7).
• Open the water supply to the mixer.
MONTAGEANLEITUNG
INSTALLATION INSTRUCTIONS
4
3
6
7
5
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis