Herunterladen Inhalt Inhalt Diese Seite drucken

Chauvet Professional Ground Support 2 Schnellanleitung Seite 4

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

EN
Setup
Before setting this product up, read the
Before beginning the setup, read all instructions in this section and in the
section! Plan correctly for the type of setup to be created!
1. Insert TR16 screw jacks into their corresponding threaded holes on the bottom of the dual-function rig bar (DRB-
F50CM or DRB-F100CM; not included with the Ground Support 2 Kit).
2. Align the male speego connector of the floor base with the female speego connector of the rig bar.
Use the female speego connectors under the hoist rings for video panel assemblies with center mounting
positions.
Use the alternate female speego connectors for video panel assemblies with only corner mounting positions.
3
QUICK REFERENCE GUIDE
Safety
Notes.
Threaded holes for TR16 screw jacks
Mounting Procedures
For center-mounting
For corner-mounting
Ground Support 2 Kit QRG Rev. 4

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis