Herunterladen Inhalt Inhalt Diese Seite drucken

Chauvet Professional Ground Support 2 Schnellanleitung Seite 11

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Mounting Procedure (Corner)
If the F-series video panels being used do not have threaded mounting holes in the center position, the threaded
mounting holes in the corner positions must be used. If the panels have threaded mounting holes in the center position,
see
Mounting Procedure
1. Attach the F-series video panel to the rig bar panel by aligning the magnetic alignment conicals and locking the
male speego connections.
2. Insert the M12 panel attachment screws into the corner-position M12 threaded mounting holes and secure with a
3 mm hex key.
The F2 and F5IP video panels have frames with a center mounting position. The F3 video panel will
need the panel attachment screw inserted at the corner of the frame. Both the F4IP and Vivid 4 have
been upgraded with center mounting position frames, and may vary depending on order date.
Ground Support 2 Kit QRG Rev. 4
QUICK REFERENCE GUIDE
(Center).
M12 panel attachment screws
Video panel
EN
10

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis