Herunterladen Inhalt Inhalt Diese Seite drucken

Viva VVA92E250 Gebrauchs- Und Montageanweisung Seite 26

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
08. Screw in the two lower hexagon head
cap screws.
Before the 4 screws are tightened
down, align the extractor hood properly.
09. Connect up the air outlet pipe.
10. Connect the hood to the electricity
supply.
11. Stainless steel model:
K Remove the protective film from the
two flue ducts.
Avoid damage to the sensitive
surface.
Warning: The interior walls of the flue
panelling can have sharp edges – Risk of
injury –.
We recommend that you wear gloves when
installing.
26
12. Push both sections of the flue panelling
together (slots in the upper section
must be pointing downwards) and
insert into the opening in the extractor
hood.
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
1.
13. Slide out the upper section and attach
it to the mounting brackets at the sides
with two screws.
14. Insert the grease filter (refer to
Operating Instructions).
3.
2.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vva62e250

Inhaltsverzeichnis