Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Start-Up And Installation - Schick QUBE Assist Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Accessories/options
chuck Ø 2,35mm
c
huck key
engineers wrench
motor cable complete
cable satellite 0,5m
cable satellite 1,5m
signal cable QUBE
riveting hammer(1)
Art.no.
1850/2
twin riveting hammer (2)
Art.no.
1860/2

5. Initial start-up and installation

5.1 Installation of the suspension strip for knee control unit or work bench control unit
1.
1 The suspension strip (7) is supplied with a template which acts as an aid for correct positioning of
the
knee control unit. To do this, the mounting bracket is positioned on the work bench as
shown in figure 1, and secured using the screws supplied (8). After installation, the template can
simply be detached from the bracket.
2. For installation of the knee control unit, the cavity at the rear of the unit is placed on the bracket and
pushed back until it clicks into place (Fig.2).
9142
4115
9188
9280
9124/1
9124/2
9229
1
2.
4
2.
1.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis