Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Start-Up And Installation - Schick QUBE Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

5. Initial start-up and installation

5.1 Installation of the suspension strip for knee control unit or work bench control unit
1.
1 The suspension strip (7) is supplied with a template which acts as an aid for correct positioning of
the
knee control unit. To do this, the mounting bracket is positioned on the work bench as
shown in figure 1, and secured using the screws supplied (8). After installation, the template can
simply be detached from the bracket.
2. For installation of the knee control unit, the cavity at the rear of the unit is placed on the bracket and
pushed back until it clicks into place (Fig.2).
5.2 Fixing the power supply with the velcro
The delivered velcro can be used to attach the power supply under the workbench (Fig.2).
1.
1. Remove one of the protective foils of the velcro and attach it to the power supply.
2. Remove second protective foil and stick the power supply to a clean and even surface. Please avoid
permanent load to the power supply by the cables.
2.
2.
5
2.
1.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Qube premiumQube plus

Inhaltsverzeichnis