Herunterladen Diese Seite drucken

Konig & Meyer 14950 Bedienungsanleitung Seite 4

Tuba-spielständer

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. TUBA SUPPORT
4.1 MATERIAL
4.1
The solid inner steel core is coated with a thick
4.1
rubber-like plastic padding
4.2 MOUNTING
4.2
The bushing on the underside of the support d
4.2
is pushed onto the extension tube c up to the stop
4.2.1 The support is fixed more or less firmly by tightening
4.2.1
the lateral wing screw d.1.
4.3 FUNCTION and FORM
4.3
The tuba support d resembles a convex shell into
4.3
which the instrument can be layed up to a certain extent.
4.3.1 A central hole (ø 29 mm) also provides space for a
4.3.1
button or comb at the bottom of the tuba.
4.4 ROTATABILITY
4.4
The tuba support on the extension tube can be basically
4.4
twisted, this is convenient when playing a lively tempo.
4.4.1 The tenacity of the connection is adjusted by the
4.4.1
lateral wing screw d.1.
NOTE: When moving or transporting the stand please
consider that the support and the base may unintentionally
separate from each other. Therefore, it is safer always to
hold both parts simultaneously.
5. STAND and INSTRUMENT
5.1 PLACING THE TUBA IN THE SUPPORT
NOTE: The support d is thickly rubberised and rounded
everywhere. Nevertheless: careless placing of the tuba
may represent a hazard which must be avoided.
5.1.1 Place the tuba in the support slowly and in a
5.1.1
controlledmanner. Particular attention must be
5.1.1
paid to the correctalignment of the tuba: coming
5.1.1
vertically from above, it should lean centred in
5.1.1
the curvature of the support.
5.1.2 Under no circumstances should it plop in one of the
5.1.2
4 "corners", then this could lead to dents in the
5.1.2
sheet metal.
5.2 PLAYING THE TUBA ON THE STAND
5.2
The stand carries and positions the instrument,
5.2
but it should always additional be held by the player.
5.2
This is only a performer stand; it is not a rest for the
5.2
instrument (like the K&M-14940).
6. HEIGHT
The height (450-800 mm) can be changed by means of the:
6.1 EXTENSION TUBE: for procedure see chapter 3
6.1
- Traverse path max. 250 mm
6.2 BASE: See chapter 2 for procedure
- Traverse path max. approx. 100 mm
NOTE: Changes to the extension tube and/or base
must always be carried out in unloaded condition.
7. DIMENSIONS
MAINTENANCE, CLEANING
- Always carry out maintenance in unloaded condition
- Regularly check:
- a. proper condition of the components (defective parts
- a.
have to be replaced or repaired)
- b. tight fit of all screw connections
- Pay attention to possible hazards like bumping,
-
overturning, squeezing during maintenance work
- For cleaning use a slightly damp cloth and a non-abrasive
-
cleaning agent
FAULT-FINDING (F) and REPAIR (R)
F: Stand is crooked R: Check the floor or correct;
F: Stand is crooked
R: Check parquet protectors and replace if necessary
F: Stand is crooked
R: Repair bending error of the base (K&M)
F: Extension tube retracts unintentionally B: Tighten wing screw b.1
F: Extension tube retracts unintentionally
F: Tuba support is crooked B: Check the function of the tubes and
F: Tuba-Auflage sitzt schief B:
replace them if necessary
F. Tuba support wobbles B: Tighten all wing screws
B: Make sure that the bushing d.1 is seated up to the stop
TECHNICAL DATA
Tubes, sheets, screws: Steel, powder-coated, black
Screws, washers, threads: Galvanised steel
Material
Sockets, handles, clamp: PA, black
Rubber coating, parquet protector: TPE, black
Dimensions
Base circle ø 480-780 mm, height: 450-800 mm
Weight
2 kg
Cardboard
inside: 842 x 206 x 123 mm
4. TUBA SUPPORT
5. STAND and INSTRUMENT
6. HEIGHT and
7. DIMENSIONS
B: Install the locking pin correctly
KÖNIG & MEYER GmbH & Co. KG
Kiesweg 2, 97877 Wertheim, www.k-m.de
14950-000-55 Rev.15a 03-80-542-00 10/20

Werbung

loading