Herunterladen Inhalt Inhalt Diese Seite drucken

Zoef Robot Ada ZB20C Benutzerhandbuch Seite 24

Schwimmbadroboter
Vorschau ausblenden Andere Handbücher für Ada ZB20C:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.4.3 Re-install the filters, pay attention to the good position and slide the two clips to close the
top cover.
4.5 Foam installation
Please refer to following operation if it is difficult for the cleaner to climb the wall and clean the
waterline. The following operation is not necessary if the cleaner climbs the wall well.
Open the top cover and glue the float block at the position shown in the below picture. The other
side is also glued.
Note:
1. You can also glue the float block on the top cover without removing the cover. Touch the
position with your hands and glue it according to the picture.
2. The float block has glue on its back, so It must be glued on the top cover tightly and then put it
into the pool 24 hours later.
8

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis