Herunterladen Inhalt Inhalt Diese Seite drucken

AFRISO ProCalida IN 1 Betriebsanleitung Seite 26

Heizkreisverteiler
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

5
Mounting
BURNS CAUSED BY HOT LIQUID
Water in heating systems is under high pressure and can have temperatures of
more than 100 °C.
• Verify that the heating water has cooled down before mounting the product.
Failure to follow these instructions can result in death, serious injury or
equipment damage.
 Protect the heating circuit manifold against direct sunlight.
5.1
Mounting the bracket holder
Heating circuits
Required brackets
Mounting
WARNING
2-5
6-9
2
3
10-14
15-19
4
5
ProCalida® IN 1½
EN
20
6
10
Inhaltsverzeichnis
loading

Inhaltsverzeichnis