Start-up
spring latches (E) upwards (see fig. 3).
•
Make sure that the spring latches are completely
latched and that the device is seated solidly on
the rail.
•
Place the transformer next to the floor heating
actuator onto the DIN rail (see fig. 4).
•
Latch the transformer by pressing the spring latch
upwards (see fig. 4).
•
Make sure that the spring latch engages properly
and that the device is securely seated on the rail.
6
Start-up
6.1
Installation instructions
Please read this entire section before starting to
install the device.
Please note! Only to be installed by persons
with the relevant electro-technical knowledge
and experience!*
Incorrect installation can put
•
your own life at risk;
•
and the lives of other users of the electrical sys-
tem.
Incorrect installation also means that you are running the
risk of serious damage to property, e.g. because of a fire.
52