Herunterladen Inhalt Inhalt Diese Seite drucken

Lighting Technologies SKYLINE LED 120 Montageanleitung Seite 8

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1. Switch mains power off. Unpack the luminaire.
2. Strip mains cable according to dimensions shown.
3. Connect the net wires, observing polarity: L – «brown», N – «blue», GND – «green/yellow»
4. Installation on pole support.
4.1. Tools needed
4.2. Mount the luminaire on support or vertical pole with diameter 48-60 mm. Adjust luminaire's
position using the bubble level (1) on the bracket. Fix the luminaire by tightening lock screws (2)
with at least 18 Nm of torque. Lock the screw with hexagonal nuts (3).
4.3. Release screw (4) if needed. Set luminaire tilt angle needed using marks on the bracket
(marks intervals - 10°, turn intervals - 5°). Tighten the screw (4) with at least 18 Nm of torque.
5. Installation on suspension wire.
8

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Skyline led 30Skyline led 60Skyline led 90

Inhaltsverzeichnis