Setting Up
Step 1: Place the machine on a flat surface and in a suitably large area with at least 50 cm
open space around the machine.
Step 2: Fill the fluid tank with Antari approved fluid.
Step 3: Connect the machine to suitably rated power supply. To determine the power
requirement for the machine refer to the label on the back of the machine.
Step 4: Turn on the machine and allow it to heat up. Heat up takes approximatley 5 mintues.
Once the machine has reached operating temperature, the LCD display will show "Ready To
Fog". Now the machine is ready for operation.
Step 5: To start making fog, locate the Volume button on the control panel, and press the
button to start making fog.
Step 6: To turn off the machine, press STOP button and turn Powercon to the OFF position.
Operation
Control Panel Operation
The machine can be operated with an onboard digital control interface
Downloaded from
www.Manualslib.com
Always connect the machine to a protected circuit and ensure it is properly
grounded to avoid risk of electrocution.
manuals search engine
5