Herunterladen Inhalt Inhalt Diese Seite drucken

Z-RAY JAVELIN 300 Bedienungsanleitung Seite 5

Sports boat
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 16
INFLATING AND DEFLATING THE BOAT
Inflating
Caution: Do not over inflate, or use a high-pressure pump!
Please inflate air chambers by number sequence. Do not over inflate.
Maximum pressure for air chambers
0.15bar(2.18PSI) for chamber 1,2,3
0.10bar(1.45PSI) for chamber 4
After inflating screw the valve cap A in clockwise direction by hand.
Deflating
Remove the valve cap A, push down the deflation button C and turn the valve
by 90° until its is locked. Release the valve and the air will flow out. If you want
to stop the deflation, push down the deflation button C and turn it by 90°. The
deflation will stop when the valve is released.
8
Downloaded from
www.Manualslib.com
www.zraysports.com
ZBV-16-GB(V1)
manuals search engine
INFLATING AND DEFLATING THE BOAT
Assembly of the oar
Screwing coupler with front shaft, then insert the rear shaft into the oar locks from
the outside of the boat, join them together by screwing the coupler with rear shaft.
The coupler is then placed on the inside of oar locks to prevent the oar from
sliding into the water.
9
www.zraysports.com
ZBV-16-GB(V1)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis